Pictures of the Cornwall Eden Project
Places to stay near The Eden Project
Back to the Eden Project Index page Start of construction Biome Construction
Opening of the Gateway Building Opening of The Eden Project March 2001
Links Page Email me Places to stay near The Eden Project
04/10/00 Inside the warm biome. Some of The Eden Team on a special visit to the biome.
04/10/00 Just a few pictures inside the humid biome, taken at 6.30 pm getting dark
03/10/00 Media day, school children look on as Eden takes the headlines again.
28/09/00 So much happening at Eden. 03/10/00 Media day Sky Monkeys on humid
28/09/00 Eden train driver? How do you get a very tall tree in a lorry? Very carefully.
28/09/00 Temptations entrance ramp. Plants by the lorry load. Large lake lots of water.
26/09/00 Views of Eden. Eden's artist Sue Lewington called in to do a book signing.
26/09/00 Arena bank planting. More plants for humid. Temptation growing. More soil for warm
22/09/00 26/09/00 Plants arriving and being planted in humid. Lots of water in the large lake.
22/09/00 Packing cases full of biome goodies. Happy staff and car park attendants at Eden.
22/09/00 Roofless plantings marked out. Temptation glazed and entrance constructed.
19/09/00 Lake flooded. Work on humid. 22/09/00
15/09/00 Humid more soil and grass. Lake has a lot of rain. 19/09/00 Heat exchanger-humid
15/09/00 Planting visitor centre bank. Large lake work continues. Digger gets to work.
13/09/00 Large lake has more work. Close up of grass roof. Lake gets cemented.
13/09/00 Eden's train driver, plants arrive, Sky Monkeys on humid, Grass growing on Temptation.
10/09/00 Humid heating ducting and glazing of Temptation.
08/09/00 Works entrance landscaping Lake liner. 10/09/00 Close up humid biome.
08/09/00 Soil going in. Lake another layer. The power house. Sky monkeys at work.(rain)
05/09/00 Lake lining. Minister in rain shower. Ducting parts. 08/09/00 Tem Roof.
05/09/00 Weeding. Tim over coffee. Large lake work. Temptation roof work.
30/08/00
30/08/00
30/08/00 Sky monkeys at coffee
22/08/00 28/08/00
22/08/00 The last panels go in to the biomes
20/08/00
19/08/00 More cells covered. Tarmac road going down to biomes.
14/08/00 Covering going well on the warm biome. Large lake work still going on.
14/08/00 Matting being installed and steps down to the biome being fitted.
14/08/00 Sunshades arrive! Picture of happy helpers.
11/08/00 Large Panorama may take a while to load, but worth it.
Places to stay near The Eden Project