Pictures of the Cornwall Eden Project
(Thumbnails click to enlarge. Click 'back' on your browser after viewing large picture to come back here.)
Back to the Eden Project Index page Start of construction Biome Construction
Opening of the Gateway Building Opening of The Eden Project March 2001
Places to stay near The Eden Project Eden Fast Tract Ticket Sales
09/08/00 Covering going well.
07/08/00
07/08/00 Hill side being Spray-seeded Hot Day
05/08/00 New path appeared. Covering of the biomes going well.
05/08/00
03/07/00
03/07/00
31/07/00
31/07/00
28/07/00 31/07/00
28/07/00 Work on the large lake. Matting being installed near Gateway Building.
28/07/00
28/07/00
24/07/00 Warm-biome taking shape quickly. 28/07/00
24/07/00 The Soil slope is smoothed out and tidying is going on at the top of the old pit.
24/07/00 Arena is getting a lot of attention. At the Energy unit work is progressing.
18/07/00
18/07/00
Arena 16/07/00 18/07/00
16/07/00 Flexi forest 16/07/00
16/07/00
The big lift 15/07/00 Heat exchangers 16/07/00
14/07/00 Heat exchangers arrive. The energy building. 15/07/00
11/07/00
11/07/00
07/07/00
04/07/00
29/06/00
29/06/00
29/06/00
29/06/00
29/06/00
29/06/00
28/06/00
28/06/00
25/06/00
24/06/00
24/06/00
20/06/00
05/06/00
05/06/00
05/06/00
Galleries 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Places to stay near The Eden Project
|
|